+
  • photobank (26).jpg
  • photobank (30).jpg
  • photobank (36).jpg
  • photobank (22).jpg
  • photobank (41).jpg
  • photobank (42).jpg

CPE Hospital Gown

Category:


Our CPE Hospital Gown provide an effective, low-cost garment solution that protects against dry particulates such as dirt and dustin the workplace. *Raw material: 100% Virgin material. It can be made of CPE ,PE and TPE *With thumb holes and sleeves. *Multi-color for clients to choose.

It is located in Pengchang Town,Xiantao City, Hubei Province, which has the reputation of "China's largest non-woven production base",It is a plastic product entity unit integrating processing, sales and trading。


Introduce


CPE Hospital Gown are standard thumb loop CPE gowns that provide great protection and will help save time and keep sleeves from sliding up. Thumb loop CPE gowns have an apron-style neck, so gowns can be removed quickly. Helps to provide protection against high levels of luid

Description CPE Hospital Gown
Material CPE
Process cutting,heat sealing
Style straight pendulum, swallow tail,elastic cuff and so on
Size 112*117cm/118*131cm/115*125cm
Gram Weight 25-70g/pc
Color White,blue,pink,yellow.green
Packing 1 pc/bag,15 pcs/box,75 pcs/ctn
Feature back broken point type, waterproof,anti-fouling,sanitary and convenient
level Level 2
Remark size and packing can be customized
Applicable scenario All kinds of factories,laboratories,household, food workshops.

FAQ:

Q1.What are the payment terms ?

A1.We accept T/T(PayPal for small orders, Company account for regular orders), L/C at sight.

For established customers, we can discuss the L/C (extension of credit time) or DP payment, or other payment terms.

Q2.What if there is problem with the products after receiving ?

A2.We take pictures for you before shipping confirmation. If you note any production deficiencies, please send us notice (product pictures by email). We will correct what is not suitable or make other compensation.

Q3.What is the usual shipping time ?

A3.The shipping time is usually 3 to 5 working days by express or air, and 15 to 30 days by sea.

 

 

Factory Display


Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Workshop

Message consultation